‹ View All Articles
August 28, 2025
Don't Misunderestimate

“Misunderestimate” is a good example of a creative malapropism. It’s also a useful concept in the practice of exterior restoration.

Contractors are obligated to produce results that conform to the engineers’ and architects’ (E/A’s) contract documents. If contractors misunderstand the scope of work to be performed, they may underestimate the means and methods required.

CD’s that clearly and completely delineate the scope of work allow the contractors’ estimators to properly anticipate the required work (rigs in simultaneous operation, lead times, permits, etc), minimizing cost and schedule overruns once the project begins.

SUPERSTRUCTURES consistently strives to produce CDs that minimize the likelihood that contractors will misunderestimate our intentions.

SUPERSTRUCTURES Engineers + Architects

14 Wall Street, 25th Floor, New York, NY 10005
(212) 505 1133
info@superstructures.com

SuperScript

Subscribe to SuperScript, our email newsletter.

SUPERSTRUCTURES LinkedIn
SUPERSTRUCTURES Instagram
SUPERSTRUCTURES YouTube
TOP
chevron-upcross-circle